|
Chapel of Divine Mercy -- Construction Pictures (Posted on October 21, 2006)
Footers for the walkway that will run from our present front door to the Chapel's side door
Pouring of footers at the beginning of the walkway; there will be an extension to one of our offices at the second floor level directly above this section of the walkway
Walkway site -- gravel base is prepared; almost ready for the concrete!
View of the East end: heating and air-conditioning ductwork is in place
Plumbers have been digging their trenches and preparing the pipes to connect the bathrooms to the septic system
Closer view of the ductwork See Additional Pictures (2 pages total in this posting) Chapel of Divine Mercy -- Previously Posted Pictures Donations to Support our New "Chapel of the Divine Mercy" Building Project: To setup a monthly donation with your credit card using PayPal: Donations to Support our New "Chapel of the Divine Mercy" Building Project:
Thank You and May God Bless You for your prayers and support! |
Fathers
of Mercy - 806 Shaker Museum Road - Auburn, KY 42206 (270) 542-4146 - fax (270) 542-4147 |